10-10-2009, 12:41 PM
Lent the camper out and well , they overflowed the septic tank and never dumped the waste . The results were kinda messy . Lesson learned .
Had to replace the floor and some plumbing , that was easy .
The hard part was fabricating the bottom outside cover and installing it . I had to overhang the camper off a hill to give me working room and then brace the sheetmetal into position without bending it .
Bags of pineneedels , a few scrap pieces of wood and yep even a lifevest was used to make the job a little easier .
I feel so redneck
.
[signature]
Had to replace the floor and some plumbing , that was easy .
The hard part was fabricating the bottom outside cover and installing it . I had to overhang the camper off a hill to give me working room and then brace the sheetmetal into position without bending it .
Bags of pineneedels , a few scrap pieces of wood and yep even a lifevest was used to make the job a little easier .
I feel so redneck
![[Image: happy.gif]](http://www.bigfishtackle.com/images/gforum/happy.gif)
[signature]