04-27-2023, 12:54 PM
UPDATE
Finally got a good day, so I took
the plunge removing fuel tank
Removal of sending unit
Upon removal found intake screen
broken away but was held in place with
sender holding against tank bottom
Remove housing cover for inline
screens. Right side completely clogged,
left was about 80%+ clogged
This is what they should look like
after cleaning
Then I started on the modification
The intake pipe added is 4" with new
intake screen at the bottom. The "Z"
pipe is added to extend beyond
float, this is fuel return from engine
after heated
Finally got a good day, so I took
the plunge removing fuel tank
Removal of sending unit
Upon removal found intake screen
broken away but was held in place with
sender holding against tank bottom
Remove housing cover for inline
screens. Right side completely clogged,
left was about 80%+ clogged
This is what they should look like
after cleaning
Then I started on the modification
The intake pipe added is 4" with new
intake screen at the bottom. The "Z"
pipe is added to extend beyond
float, this is fuel return from engine
after heated